Milestone

Just in time for Christmas

A true milestone has been achieved with the on-schedule completion of the excavation pit. Following a long tradition, the completion of the 700-metre-long diaphragm wall was celebrated with the diaphragm wall festival. The diaphragm wall is secured with 400 anchors, embedded 18 metres below the site’s surface.